Construction of a plastic factory

/Project Description

Year of construction

2020

Type

Industrial Cluster

Square

26,000 M2

Address

Khorezm region, Yangiaryk district

Project goal

Create a modern production facility for the production of plastic products that meets international standards of industrial construction and environmental safety. The main task is to ensure efficient planning of production, storage and administrative areas, as well as to introduce energy-efficient solutions that reduce operating costs.

Landshaft Naxshab Role

The bureau developed the architectural concept and master plan of the plant, determining the optimal organization of technological flows and engineering infrastructure. The project uses BIM technologies for accurate visualization and calculation of building parameters, which increases the efficiency of design and construction. Special attention is paid to the industrial aesthetics and adaptation of the object to the climatic conditions of the region.

/Result

The project of the plant has become an example of a modern approach to industrial architecture-combining functionality, technological efficiency and visual rigor. The proposal formed the basis of the working documentation and became part of the regional program for the development of the production potential of the Khorezm region.
26000
M² designed area of the industrial complex
7
months for the entire project
6700000
$ project cost

/Gallery

/Similar Projects

Chemical Cluster

Tashkent, Mirzo-Ulugbek District

Astrum IT academy

Tashkent, Mirabad District

Concept: Multiprofile Correctional School for 200 Students

Tashkent, Sergeli District

Chirchik Machine Building Cluster

Chirchik, Tashkent region

Would you like to discuss a similar project?